Publix Pharmacy at Halifax Health Medical Center

​RUSH Construction served as the GC for the new Publix Pharmacy at Halifax Health Medical Center. The full-service one-story Pharmacy is adjacent to the walk-in emergency entrance at the north end and east side of the France Tower. Construction required detailed coordination to minimize disruption of the normal daily operations and consideration of the patien​​ts,…

RUSH-i4-Business-FB-Cover-022520

RUSH Construction Featured on the Cover of i4 Business Magazine

RUSH Construction, Inc. has been featured on the cover of the February 2020 issue of i4 Business, published on Jan 28, 2020. “Promoting Entrepreneurs​​hip throughout Central Florida with i4 Business Magazine Orlando i4 Business Magazine is a fresh voice for Orlando businesses’ economic corridor, introducing readers to the most successful and innovative companies, along with…

RUSH in i4 Business - No Limits

i4 Business: No Limits

How RUSH Construction is Covering More Land, Sea and Sky What happens when relationships are matched with opportunities? According to RUSH Construction President and ​​CEO William Chivers, that would be growth. In more than 35 years of service, RUSH has steadily built both a sturdy company and a staunch reputation. With sizeable contracts awarded and…

SpaceCoast Business: Bob Dillow | RUSH Construction

​Designing and building a facility with an eye for what it will take to maintain it enhances the overall value proposition of the project. RUSH Facilities President, Bob Dillow, joined the RUSH Family of Companies to do just that. Dillow enjoyed a 32-year Navy career that included 30+ years of managing repairs and operations on…

Viera Charter School

​RUSH Construction, Inc. served as the Design-Builder for the expansion and remodel of the Viera Charter School Campus located in Viera, FL. The new 46,700 square foot expansion consists of a 2-story building that includes 24 classrooms, as well as a gymnatorium and a new cafeteria. The new classrooms includes general educational classrooms, new music…

Space Florida Launch and Landing Facility

RUSH Facilities has a 4-year contract with Space Florida at the Kennedy Space Center which includes overseeing 2,400 acres, the maintenance and operations of 13 structures, maintenance and operations of a 15,000 foot runway including lighting and runway surfaces, grounds maintenance, environmental services, life safety services and maintenance and maintaining ground support equipment and a…